Digital construction project at Tang Jia River Union Station, an oilfield
Petroleum petrochemicals

Digital construction project at Tang Jia River Union Station, an oilfield

Client: an oil field branch Region: North China

Background

Project background

Data on multiple systems such as metrology, separation and external transmission are stored in the industrial control software of different manufacturers and there is a lack of harmonized data exports.

Challenge

Project challenges

Most of the stock systems provide only OPC DA interfaces and are deployed in a separate Windows Work Network, physically isolated from the office network.

Solution

Solutions

Deployment of a perimeter collection gateway to access the OPC DA/OPC UA interface, data entering the one-way isolation device to the network platform, and integrated consumption of the field management system.

Results

Building results

3000 + point minute collection, automatic generation of reports, reduced manual copying of 80%.

Reference to your project to build on this case

We provide a full-process service from programme design to delivery.

Contact us