Upgrade of the digital retrofit
The old device is new, from single-point digitization to the whole factory.
Provides for phased intellectualization of storage devices and old systems: instrument upgrades, protocol penetration, data governance to platform building, smoothing down without parking or rollover.
Overview
Overview of services
- ✓ Phased evolution path, which can be implemented using a overhaul window, without prejudice to normal production
- ✓ Stock instrument access via protocol gateway to avoid reversing re-inventory investment
- ✓ Harmonized data models and codes to provide data base for subsequent smart applications
The digitally intellectual dilemma of many enterprises is not the absence of systems, but the burden of history: mechanical readings are manual, old DCS data are not available, data between systems are isolated, and some of the “platforms” that were used become data graves. (a) Digital-modification upgrading services in Puyotech, which adhere to a “phased, landable, non-repeated” path: the first stage of the instrument is upgraded to a remote-based intelligence instrument using the protocol gateway to access the stock-usable instrument; Phase II, data governance, harmonization of coding, unit and point models, to move data from "readable" to "usable"; Phase III is built on a business value-by-business basis — energy consumption analysis, equipment health, quality retrospective, smart alarm. Each phase of the modification can be implemented using a shutdown window, without affecting normal production and with clearly identifiable output.
Capabilities
Service capacity
Assessment planning: mapping the status quo (digital maturity assessment) + road map for phased transformation
Upgrading of instrument: smartener of mechanical/simulation instrument, retention of available assets, replacement of bottlenecks points
System access: OPC gateway, IP platform access, elimination of DCS/PLC/Independent System Data Solo
Data governance: harmonization of location codes, engineering profiles and data quality rules, sedimentation of enterprise data assets
Application construction: energy consumption analysis, equipment health, quality retrospective, by business value
Process
Service flow
01
Assessment of the current situation
(c) The status of the tectonic instrument, system, data and processes, and output of the maturity assessment report.
02
Route planning
Develop a phased road map and investment priorities to identify operational benefits for each phase.
03
Subparagraph Implementation
Implementation is done using the overhaul window, which is then rolled over after acceptance.
04
Ongoing operations
The accompanying operational indicators are aggregated and optimized to ensure that the transformation results continue to produce value.
Deliverables
Delivery
- ✓ Digital maturity assessment reports
- ✓ Phased retrofitting of road map and budget
- ✓ Data governance norms (coding/unit/quality rules)
- ✓ Phases of implementation and acceptance documents
Applications
Typical application scenario
- ▸ Overall mentalization planning and adaptation of old factory areas, old station depots
- ▸ Data opening and platform interface for existing DCS/PLC systems
- ▸ Integrated governance of multi-system data islands
Apply
D.D.I.D. Upgrade - Application
Submit your service needs, and the Pu Yi team will contact you within 1 working day, communicate the range of services, time and offer.
- ✓The original engineer team leads
- ✓Clear service lines, processes and deliverables
- ✓Phased implementation to support window overhaul and privatization deployment